• Home
  • News
  • Features
  • Magazine
    • Current Issue
    • Digital Archive
    • Advertise
      • About Us
      • 2021 Media Pack
      • Features
  • Newsletter
  • Subscribe
  • Contact Us

PSBNews

Banner
  • Home
  • News
  • Features
  • Magazine
    • Current Issue
    • Digital Archive
    • Advertise
      • About Us
      • 2021 Media Pack
      • Features
  • Newsletter
  • Subscribe
  • Contact Us

Wilmott Dixon completes £46.5M University of Birmingham development

by Francesca February 8, 2021February 8, 2021
written by Francesca February 8, 2021February 8, 2021
Wilmott Dixon completes £46.5M University of Birmingham development

BUILDING work has completed this month (February 2021) on the £46.5m School of Engineering at the University of Birmingham, thanks to national contractor, Willmott Dixon.  

The state-of-the-art 12,000 sqm facility spans five floors and features a double-height atrium. The development aims to not only bring together many of the institution’s engineering disciplines, but also provide opportunities for successful collaboration between academia and the industry.

Procured through the Constructing West Midlands framework, the School of Engineering puts industry at the heart of the University’s campus, alongside the £16.4M UK Rail Research and Innovation Network (UKRRIN) Centre of Excellence in Digital Systems.

The facility’s design was curated specifically with agile and collaborative working between academics, researchers, students, and staff, in mind. The development offers open plan spaces and cellular facilities including a dedicated Student Support Hub, a new 179-capacity Design Centre, a 50-seat electronics and electrical focused projects space, 20 flexi-bays specifically allocated for staff and student interactions, three 50-seat seminar rooms and also features 160 drop-in study spaces throughout the building.  

The basement also houses a full-size set of railway points, the University’s pantograph test rig and a test track for the scaled hydrogen-powered train – further expanding the university’s commitment to the integration of academia and industry.

Nick Gibb, deputy managing director for the Midlands at Willmott Dixon, said: “We are delighted to have completed such a significant development, both regionally and within the sector – the facility is set to pioneer advancements within engineering and digital systems research.

“Despite completing the final stages of the project during the Covid-19 pandemic, our teams optimised industry-leading safety and social distancing measures, which meant we were able to remain on-site throughout the pandemic and ultimately deliver the project to the agreed timescales. This development is the fifth major partnership we have entered into with the University of Birmingham, having recently completed the Teaching and Learning Building, along with the Green Heart campus development.

“One of our main aspirations for this development was to provide a highly energy-efficient building. Throughout the project we implemented a sustainability strategy to ensure the facility would be built and operated in an energy efficient way right from the outset, including the optimisation of Passivhaus design measures. These efforts, combined with the adoption of our industry-leading Energy Synergy™ process has enabled us to predict that 45% of the building’s energy consumption will come from unregulated sources, such IT equipment, lab equipment and external lighting. These sources are highly linked to occupant usage and can fluctuate throughout the building’s lifecycle.

Designed by Associated Architects, the School of Engineering demonstrates the university’s commitment to providing first-class engineering education. The development aims to improve student experience, allowing engineering undergraduate and postgraduate students to get involved in cutting-edge research and ensuring students graduate with a strong connection to the industry.

Head of the University of Birmingham’s School of Engineering, Professor Clive Roberts, said: “We are delighted to receive the keys to the newly built School of Engineering. We are committed to providing the best facilities for our staff, students and researchers, as well as enabling collaboration with our industry partners and encouraging different and more flexible ways of working.

“We are passionate about educating the next generation of engineers. Alongside accessing features such as the Design Centre and our expanded computer labs, our new building provides students with the opportunity to work with engineers across the disciplines. Their learning will mirror the workplace, encouraging and developing their understanding of industry and their role within it.

“The new building also sits alongside our new centre of excellence in railway innovation, the UK Railway Research Innovation Network (UKRRIN) Digital Systems Innovation Centre, placing industry at the heart of our campus. In the coming months, we are looking forward to opening its doors to welcome staff, students and industry partners.”

Warren Jukes, director from Associated Architects, said, “This scheme has afforded us the opportunity to design a beacon of engineering excellence, to attract the world’s best academics and students to the University of Birmingham.  The project was a major engineering feat in its own right, and we take immense pride in overcoming the challenges it brought. We feel privileged to have had the opportunity to work closely with the School of Engineering, University and Willmott Dixon to realise such an inspiring facility that will enable growth and achieve research excellence.”

As part of Willmott Dixon’s commitment to leaving a legacy in the local community, throughout the development the contractor ran its Enrichment Programme in partnership with the University of Birmingham School for local pupils. The programme was created to broaden the students’ understanding of career opportunities whilst giving them a chance to develop their character virtues. The contractor also facilitated 157 student visits to the site, hosted 71 work experience weeks with local people and enabled 202 weeks of ‘on-site’ apprenticeship training.

0 comment
0
FacebookTwitterGoogle +Pinterest
Francesca

previous post
Stepnell takes ‘centre stage’ following completion of historic costume workshop construction and restoration
next post
Avoid Excess Electricity Bills During Covid-19 Closures

Related Articles

Skanska school extension creates vital pupil spaces

October 18, 2019

Tilbury Douglas completes construction of Euler Academy in...

February 3, 2022

Grade A solution to overcrowding in schools

January 10, 2019

Clegg appointed to multi-million-pound refurbishment of historic university...

October 4, 2021

Developer to build new primary school for growing...

April 30, 2019

Conlon begin construction on site at new £5m...

November 8, 2021

Construction of new £4.85m Withernsea school building begins

September 21, 2020

mac-group starts work on £5m college building in...

May 4, 2022

Bohlin Cywinski Jackson completes Colorado School of Mines,...

February 6, 2019

Darwin Group delivers multi-use block for Reddiford School

July 16, 2020

Latest Issue

Search our website

Twitter Feed

Tweets by @PSBN_Social


 

Popular Posts

  • 1

    500 Cornish-type housing association homes get high-performance insulation in Herefordshire

    February 5, 2019
  • 2

    Braeburn Estates hands over innovative social housing scheme to Homes for Lambeth – with “game changing” new development model

    January 21, 2019
  • 3

    The 2019 Surface Design Show focus: Workplace and Public Realm

    December 2, 2018
  • 4

    Skanska completes Royal Papworth Hospital construction

    April 30, 2019
  • 5

    Understanding the current state of the student accommodation market

    April 15, 2019

Categories

  • Case Studies
  • Education
  • Features
  • Hospitals + Healthcare
  • Housing
  • Infrastructure
  • Latest News
  • News
  • Products
  • Project News
  • Uncategorized
  • Videos

Recent Posts

  • Construction starts on major mixed-use development in Wakefield

    June 23, 2022
  • Pagabo reveals winners for £1.56BN civils and infrastructure framework

    June 23, 2022
  • IWJS awarded contract extensions with two long-standing clients

    June 23, 2022
  • Lovell welcomes Salford City Mayor as new Show Homes unveiled

    June 23, 2022
  • Bouygues UK Hands Over West Hub to the University of Cambridge

    June 23, 2022

About Public Sector Building News

 

Public Sector Building News is a monthly leading trade publication that is valued within the industry.

The magazine works as an effective marketing tool for our clients, being seen by key decision makers leads to valued work within the lucrative public sector building industry.

Every issue of Public Sector Building News provides an update of news, current and upcoming projects, industry comment, interviews, articles, features and product information – covering all areas of importance to our readers.

Other Publications

Architect Projects
Construction UK Magazine
Luxury Hospitality Magazine
Luxury Interiors Magazine
Refurb Renovation News
Restaurant Industry Magazine

Editor’s Picks

  • Construction starts on major mixed-use development in Wakefield

    June 23, 2022
  • Pagabo reveals winners for £1.56BN civils and infrastructure framework

    June 23, 2022
  • IWJS awarded contract extensions with two long-standing clients

    June 23, 2022

Published by Lapthorn Media LTD

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Cookie settingsACCEPT
Privacy & Cookies Policy

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are as essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.

Privacy Overview

This website uses cookies to improve your experience while you navigate through the website. Out of these cookies, the cookies that are categorized as necessary are stored on your browser as they are as essential for the working of basic functionalities of the website. We also use third-party cookies that help us analyze and understand how you use this website. These cookies will be stored in your browser only with your consent. You also have the option to opt-out of these cookies. But opting out of some of these cookies may have an effect on your browsing experience.

Necessary Always Enabled

Necessary cookies are absolutely essential for the website to function properly. This category only includes cookies that ensures basic functionalities and security features of the website. These cookies do not store any personal information.